{"id":2665,"date":"2015-01-28T05:31:53","date_gmt":"2015-01-28T05:31:53","guid":{"rendered":"http:\/\/tgpiaimaritime.com.my\/?p=2665"},"modified":"2019-01-25T05:32:52","modified_gmt":"2019-01-25T05:32:52","slug":"benalec-gets-go-ahead-for-man-made-island","status":"publish","type":"post","link":"https:\/\/tgpiaimaritime.com.my\/zh-hans\/benalec-gets-go-ahead-for-man-made-island\/","title":{"rendered":"BENALEC GETS GO AHEAD FOR MAN-MADE ISLAND"},"content":{"rendered":"<p><small>The Sun Daily<\/small><br \/>\n<small>28th January, 2015<\/small><\/p>\n<p><strong>PETALING JAYA:<\/strong>&nbsp;Benalec Holdings Bhd will start work on its 3,485 acre Tanjung Piai Integrated Petroleum &amp; Petrochemical Hub and Maritime Industrial Park next month, with the approval of its detailed environment impact assessment (DEIA) study by the Department of Environment (DOE).<\/p>\n<p>In a filing with Bursa Malaysia yesterday, the group said the study submitted jointly by Spektrum Kukuh Sdn Bhd (a 70% subsidiary) and Perbadanan Setiausaha Kerajaan Johor, was officially approved by the DOE on Jan 23, 2015.<\/p>\n<p>The DEIA study pertains to the reclamation works for Tanjung Piai Integrated Petroleum &amp; Petrochemical Hub and Maritime Industrial Park project which comprises a man-made island to be sited off the south-western coast of Johor.<\/p>\n<p>The DOE&#8217;s long awaited approval extends beyond land reclamation works to cover the construction of oil terminal, construction of jetty, bridge linking the island to the mainland and dredging works.<\/p>\n<p>The DEIA approval is valid for 2 years from the date of the letter.<\/p>\n<p>In a separate statement to the press, Benalec said the key feature of the island is its natural water depth of more than 25 metre, enabling a short jetty to be constructed for the berthing of Very Large Crude Carrier (VLCC) vessels; this water depth is also beneficial to Benalec because the cost of any capital and periodic maintenance dredging works is expected to be minimal.<\/p>\n<p>The statement said a further advantage is that the proposed site of the island is naturally sheltered, with excellent anchorage area and is in close proximity to the Jurong Island Petroleum &amp; Petrochemical Hub, thereby affording an attractive and sizeable alternative site to existing and future operators seeking expansion in the oil &amp; gas sector within the region.<\/p>\n<p>Benalec said the board and management are confident in maintaining a very positive outlook for the group in the years to come as the time-frame for the development and completion for the Tanjung Piai project is between 10 to 15 years; however, if the demand for land on the island warrants it, Benalec has the capacity to fast-track the reclamation process, thereby shortening the time-frame.<\/p>\n<p>The group said the move takes it one significant step closer to the realization of its business plans, in sync with the country&#8217;s avowed objective of establishing itself as a storage and trading hub in the Asia Pacific region.<\/p>\n<p>As such, the project is expected to be a catalyst in stimulating strong growth and investment opportunities, as well as affording Benalec the springboard for generating recurring income streams.<\/p>\n<p>&nbsp;<\/p>\n<p>Source :&nbsp;<a href=\"http:\/\/www.thesundaily.my\/news\/1309302\" target=\"_blank\" rel=\"noopener\"><em>http:\/\/www.thesundaily.my\/news\/1309302<\/em><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Sun Daily 28th January, 2015 PETALING JAYA:&nbsp;Be [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":630,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[25],"tags":[],"_links":{"self":[{"href":"https:\/\/tgpiaimaritime.com.my\/zh-hans\/wp-json\/wp\/v2\/posts\/2665"}],"collection":[{"href":"https:\/\/tgpiaimaritime.com.my\/zh-hans\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tgpiaimaritime.com.my\/zh-hans\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tgpiaimaritime.com.my\/zh-hans\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tgpiaimaritime.com.my\/zh-hans\/wp-json\/wp\/v2\/comments?post=2665"}],"version-history":[{"count":2,"href":"https:\/\/tgpiaimaritime.com.my\/zh-hans\/wp-json\/wp\/v2\/posts\/2665\/revisions"}],"predecessor-version":[{"id":2668,"href":"https:\/\/tgpiaimaritime.com.my\/zh-hans\/wp-json\/wp\/v2\/posts\/2665\/revisions\/2668"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tgpiaimaritime.com.my\/zh-hans\/wp-json\/wp\/v2\/media\/630"}],"wp:attachment":[{"href":"https:\/\/tgpiaimaritime.com.my\/zh-hans\/wp-json\/wp\/v2\/media?parent=2665"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tgpiaimaritime.com.my\/zh-hans\/wp-json\/wp\/v2\/categories?post=2665"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tgpiaimaritime.com.my\/zh-hans\/wp-json\/wp\/v2\/tags?post=2665"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}